Independent Odoo migration practice

Move your Odoo forward. Bring everything with you.

Database migration for Odoo 13 through 18 — version upgrades, custom module porting and data verification. Rehearsed on a copy of your database, cut over on your schedule, checked down to the last record.

  • Top-Rated Plus on Upwork
  • 100% job success · 50+ projects
  • 6+ years on Odoo
Odoo in production
  • Manufacturing
  • E-commerce
  • Logistics
  • Professional services
  • Healthcare

The reality

Most migrations don't fail in Odoo. They fail around it.

Every database is custom in the same way: a module written in 2017, a report nobody wants to lose, a model that moved three versions ago. A generic upgrade path can't account for any of it.

Custom code breaks quietly

Community apps and one-off customisations reach into internals that change between versions. Each module gets ported and tested on staging — not patched on production and hoped for.

Data goes missing

A migration that "mostly worked" corrupts records you only find months later. Record counts, field-level checks and reports are compared before and after.

The business can't stop

Your team still has to work on Monday. Cutovers are rehearsed, timed and scheduled around your calendar, with a rollback you can trigger in minutes.

6+ years working on Odoo
50+ projects delivered
5 TB largest database migrated
100% job success on Upwork

The process

Staging first.
Production last.

Nothing touches your live database until it has been through all of this. That's not a sales line — it's the order of operations.

Typical migration3–8 weeks Cutover windowHours, not days
  1. Assessment

    I audit the database, custom modules and integrations, then give you a written plan: risks, timeline and a fixed quote.

  2. Staging clone

    Production is cloned to staging. The upgrade runs there — never on production — and you can test it as long as you need.

  3. Code ported

    Every custom module is ported, tested and versioned. Migration scripts handle the data where the model changed.

  4. Verified, not assumed

    Counts, checks and reports compared side by side. If something doesn't match, we find out before cutover — not after.

  5. Rehearsed cutover

    The switch is rehearsed and timed on staging. On the day it's a runbook, not an experiment — with rollback ready.

  6. Go live & settle

    I stay through the first working days, fix what appears, then hand over documentation your team can use.

Supported paths Community & Enterprise

Selected work · Manufacturing

5 TB, 500 users, and a factory that couldn't stop.

Fifty custom modules, ten years of history, and production planning running on the database every day. The upgrade couldn't interrupt the factory — so it didn't. I ported and cleaned up the custom code in phases, tuned the database, and ran the old and new systems in parallel before the switch.

Read the full case study
Field note 01 · Odoo 14 → 16
5 TBdata migrated
50+custom modules
500+daily users
0 mindowntime

"Our Odoo v14 to v16 migration was handled flawlessly. With 500+ users and critical production systems, zero downtime was essential — Babatope delivered exactly that, plus significant performance improvements."

IT Director · Global manufacturing enterprise

Questions

Before you ask.

Straight answers to the things that usually decide whether a migration happens.

Which Odoo versions do you migrate between?

Mostly 13 through 18, Community and Enterprise. Older versions and legacy ERP systems are usually still doable — the assessment tells us for sure.

How long does a migration take?

A typical database takes 3–8 weeks from assessment to go-live, depending on custom modules and data volume. Straightforward upgrades with no custom code can be much faster.

Will there be downtime?

Cutovers are measured in hours and rehearsed beforehand. Most run over a weekend, so there's no downtime during business hours — and the old system stays available until you're satisfied.

What happens if something goes wrong after go-live?

We roll back in minutes and fix it on staging. The old system is untouched until the new one has proven itself — nobody works on a broken system.

Do you migrate custom modules, or only standard Odoo?

Both. Custom modules are usually the bulk of the work: deprecated APIs replaced, views and reports rebuilt, and migration scripts where the data model changed.

What does a migration cost?

It depends on custom code, data size and integrations, which is why the assessment comes first. You get a fixed quote before any work starts — no hourly surprises.

Next step

Your database, on the current version.

Tell me what you're running — version, size, the modules you can't live without — and you'll get an honest read on what a migration takes.

Replies within 24 hours, usually faster · Remote, worldwide